Renovation Projects.

Below there are examples of some previous projects I have completed showing photos of before, during and after.
   
 

2 Bathroom Renovations, Seillans, Var.

Complete re design of 2 bathrooms and toilet. Including addition of seamless level showers, be spoke sink unit, egg bath and wall hung toilet with space saving toilet roll holder built into wall.

Bathroom Renovation, Valbonne.

Re design of master bathroom. Working closely with my clients to achieve there concept of a completely be-spoke look including sink unit, alcove structure both inside and outside shower. To include: complete re plumbing of waste and feeds, re design of layout and addition of shower. All tiling using Travertin natural stone in various designs.

Tiles and Fixtures from CBL Vallauris and Brossette

Build time 4 weeks.

Bathroom Renovation, St Paul De Vence, Robert Dalles Achitecture.

Complete re furbish of master on suite bathroom. To include: complete re plumbing of waste and feeds, re design of layout, addition of wall hung bidet and toliet, large bath with step and be-spoke shelving and plastering finish.

Tiles and Fixtures from CBL Vallauris.

Build time 6 weeks.

Complete renovation of Maison Provencal, Le Plan Grasse.

To include new kitchen, supplied from the UK. Two new bathrooms. Solid Oak flooring throughout.

Complete Bathroom Renovation, Two bathrooms, Le Rouret.

Bathroom 1. Rip out and complete new installation to include new walls and glass tiles for added light. New electrics and plastering.
Bathroom 2. Rip out existing bath and replace with walk in shower also adding wall hung toilet, including plastering and electrics.

Build time: 3 weeks.

Bathroom Renovation, Mouans Sartoux.

A complete new installation to include: addition of toilet and to ensure a seamless level throughout.
Fixtures & fittings from La Peyre

Build time: 2 weeks

Complete Renovation of an Apartment, Cannes.

Renovation of very dilapidated top floor apartment. Including re-plumbing of entire apartment, new electrics, plastering and wooden flooring throughout as well as a new kitchen and bathroom. Build time: 9 weeks.

Bathroom renovation in Antibes town house, Antibes.

Rip out existing bathroom adding shower in place of sink unit to make maximum use of space.

Theoule Project.

Complete apartment renovation.